Turfrey carried out $5m+ works to Plumbing, Drainage, Hydraulic Services, Rainwater Services and associated works to this $250 million infrastructure build to support the P-8A Poseidons for Hawkins Construction.
The Te Whare Toroa project involves the construction of the infrastructure and facilities for the P8 Poseidon Aircraft at RNZAF Ōhakea. The construction consists of two hangar bays to house the P8 aircraft, maintenance and support facilities, training and simulation facilities including the Poseidon operation and the interface works with the apron and HEF system.
SKILLS NEEDED
- Metal Roofing
- Warm Roofing
- Membrane Roofing
- Rainwater Services