Regional Aquatic Centre, Hawke’s Bay

Location : Hastings | Client: Apollo Projects | Status : Completed

Regional Aquatic Centre, Hawke’s Bay

Location : Hastings | Client: Apollo Projects | Status : Completed
Kingspan Insulated Panel Installers NZ Turfrey

What we did

THE PROJECT

Turfrey carried out Kingspan Insulated Panel Roofing & Wall Cladding, Plumbing, Drainage, Stormwater and Hydraulic Services to the facility.

The facility, which has the capacity to host international events, as well as local club meets, includes a 50m FINA World Championship/Olympic-sized pool that can be divided into two 25 metre competition pools using a movable bulkhead. It also has a separate 25m learn to swim area, and single and double hydrotherapy pools. There is enough permanent seating to fit 888 spectators and temporary seating for 1662.

SKILLS NEEDED

  • Kingspan Insulated Panel
  • Metal Roofing
  • Drainage
  • Plumbing
  • Rainwater Services
Project Enquiry

Rich Hutchinson
General Manager/Director

tenders@turfrey.co.nz